Ungerboeck / Task Integration
The following conditions need to be met for UB and TASK to integrate properly:
1. The Event Status > 27 and < 80
2. Event Designation = 'X' (Not a Job)
3. Event In Date is after today's date (cannot integrate past events)
4. Must be at Caulfield, Mornington or Sandown
5. The Disable Integration (Box Office) on the event is not selected (does not equal Yes).
If the Task Integration line does not exists, then:
1. Start Date and Start Time for the Event is passed through
2. End Date and End Time for the Event line is passed through
If the Task Integration line exists (Function Type = 'TSK' and has to be Confirmed), then:
1. Start Date and Start Time in the Task Integration line is passed through
2. End Date and End Time in the Task Integration line is passed through
All other functions must be CONFIRMED and the function categories must be 2 (F&B), 3 (Retail), 4 (Restaurants), or 6 (Ticketing).
POS Location Number (dictated by the function space) must match the terminals being used.
IF people pick up a terminal, and move it, the configuration will be incorrect and the revenue will be allocated to the wrong location.
IF the Terminal location does not exist in the scripting, no revenue will integrate.